Grouped OFF-GRID Renewable Energy Project in India

VCS-1857 ↗

#506of 770 in Renewable energy#348of 387 in India#581of 629 in Verra (VCS)#16of 26 in AMS-I.F

3.9/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This grouped off-grid renewable energy project in India has a verified additionality assessment and smart-meter monitoring, but is undermined by over 30 material findings, a temporary deviation excluding diesel generator emissions from calculations, 41 plant shutdowns during the monitoring period, and a 0% leakage deduction with no justification. The project delivered 214% of its pro-rata annual expectation, yet the instability of the plant portfolio and unmonitored DG-set emissions create meaningful over-crediting and integrity risks.

Red Flags

  • Temporary deviation allows diesel generator (DG set) emissions to be excluded from ER calculations without monitoring, creating a direct over-crediting pathway
  • 41 plants shut down and 31 non-operational during the monitoring period, indicating severe project instability and potential leakage as displaced demand shifts to grid or diesel
  • Leakage deduction is 0% with justification recorded as 'not addressed' in the most recent verification report, despite the project's high plant turnover
  • Baseline emission factor changed from 2.4 (2021 MR) to 0.9105 (2024 MR) without clear reconciliation, and the initial calculation did not use the weighted average of grid and DG-set factors as required by AMS I.F. v3.0
  • 30+ material findings and 30+ corrective actions required across the verification cycle, including missing meter calibration evidence, missing stakeholder consultation records, and plant capacity discrepancies

Credit Vintages Exhausted

IssuedRetiredAvailable
2017
5115110
2018
1,0661,0660
2019
2,2452,2450
2020
4,5684,5680
2021
5,1715,1710
Total13,56113,5610

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; 41 plant shutdowns signal instability

Leakage

0% deduction, justification 'not addressed'

Baseline

Project-specific; EF dropped 62% between cycles; initial cal

Safeguards

FPIC and grievance present per 2024 VR but early-stage gaps

Double-claim

CORSIA not eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.F.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents