Cat Hiep Solar Power Project

VCS-1965 ↗

#238of 770 in Renewable energy#11of 25 in Vietnam#274of 629 in Verra (VCS)#184of 383 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.5
Documentation
4.0

Audit Analysis

The Cat Hiep Solar Power Project is a technically sound renewable energy project with a VVB-confirmed investment additionality test and an appropriate jurisdictional grid-emission-factor baseline. However, significant documentation quality issues—including multiple within-document contradictions on safeguards, FPIC, and grievance mechanisms, an open finding on the level of assurance, and low extraction confidence—undermine confidence in the project's social and governance compliance. The project does not appear to over-credit, but the weak leakage justification and absence of documented safeguards are material concerns.

Red Flags

  • Four fields (FPIC, grievance mechanism, benefit sharing, safeguards) show contradictory values within the same verification report (2024-11-19), making it impossible to confirm whether VCS social safeguards were met
  • One material finding remained open at the time of verification regarding the level of assurance achieved by the VVB
  • Leakage deduction of 0% is justified as 'not addressed' in the verification report, while the monitoring report states it was 'deemed negligible'—an inconsistency in the basis for the zero deduction
  • Low extraction confidence across the document set, combined with 14 material findings (7 in Feb 2020, 7 in May 2020) and two corrective actions on monitoring-report quality, raises concerns about data reliability

Credit Vintages

IssuedRetiredAvailable
2019
35,06335,0630
2020
62,96362,9630
2021
52,74152,7410
2022
55,29955,2990
2023
33,59033,276314
Total239,656239,342314

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification inconsistent

Baseline

Jurisdictional grid EF, appropriate

Safeguards

FPIC, grievance, safeguards unconfirmed

Double-claim

CORSIA excluded, CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents