CECIC HKC Danjinghe Wind Farm Project
Score Breakdown
Integrity
verified The project uses a project-specific baseline under ACM0002, and the baseline was last reassessed in 2015.
missing Additionality is not documented in the extracted facts, leakage is not addressed, and reversal risk is not discussed.
Transparency
verified The VVB is named as China Classification Society Certification Company, and the record shows some validation findings were raised and then closed.
missing Monitoring-period details, claimed versus verified emission reductions, and usage-monitoring information are not stated in available documents.
Claim Safety
verified The project is a wind renewable-energy activity under Gold Standard, which is generally lower risk than many land-use credit types.
missing The baseline and leakage treatment are only partially documented, and there is no evidence here on CORSIA or CCP status to reduce dual-claim concern.
Documentation
verified The record includes a PDD, a named VVB, and a stated crediting period, with six extracted documents used.
missing One key document appears to have been difficult to read only at medium confidence, and the crediting-period contradiction between PDD versions reduces documentation reliability.
Detailed Analysis
Integrity
The project has a project baseline under ACM0002, and the baseline was last reassessed in 2015, which supports some methodological structure. However, additionality is not stated in the extracted record, the leakage justification is explicitly marked as not addressed, and reversal events are also not addressed, so the integrity case is only moderate.
Transparency
The verification body is identified as China Classification Society Certification Company, and the validation findings were reportedly closed, which helps. But the monitoring period is not found, and the extracted record does not provide claimed or verified emission reduction totals, usage monitoring, or other registry-level detail needed for strong transparency.
Claim Safety
As a wind project, the underlying activity is relatively low risk for over-crediting compared with many other project types. Even so, the claim-safety assessment is weakened by the project-specific baseline, missing leakage treatment, and the absence of any stated CORSIA or CCP status in the extracted facts.
Documentation
The record includes a PDD and indicates six documents were used, with a named VVB and a stated crediting period. Still, extraction confidence is only medium, and the contradictory crediting-period dates between two PDD versions reduce confidence; I privileged the later PDD dated 2019-10-31 because it is more recent, but the inconsistency remains a documentation weakness.
Overall
Overall, this project sits in the lower-middle range because it has some structural strengths but several important evidence gaps. The contradiction on crediting period between the 2019-10-31 PDD and the earlier 2019-01-20 PDD was resolved by privileging the later, more recent document, yet the inconsistency still lowers reliability. Under the stated gate rules, the score is not pushed down by a very low documentation score, but the missing additionality and leakage evidence keep the overall assessment cautious.
Audit Analysis
This is a standard wind project with a project baseline and some safeguards in place, but the extracted record leaves major gaps on additionality, leakage treatment, and monitoring details. The documentation also shows a crediting-period contradiction between two PDD versions, which reduces confidence in the record and keeps the score in the lower-middle range.
Project Description
Developer: Beijing Fangzhou Jiaye Technology Co ltd Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2017-04-08 → 2022-04-07 Estimated annual credits: 395001 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth
Red Flags
- Additionality is not confirmed in the extracted record, and no test type or VVB confirmation is stated.
- Leakage is marked as not addressed, with no quantified deduction or justification found.
- The crediting period differs between two PDD versions, and I privileged the later PDD dated 2019-10-31 because it is more recent, but the inconsistency still weakens reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 276,054 | 0 | 276,054 | |
| 2018 | 488,016 | 4,814 | 483,202 | |
| 2019 | 505,329 | 81,205 | 424,124 | |
| 2020 | 453,590 | 217,995 | 235,595 | |
| Total | 1,722,989 | 304,014 | 1,418,975 |
Cosa migliorerebbe questo punteggio
- Provide the validation or verification evidence showing the additionality test used and the VVB conclusion on additionality.
- Disclose the monitoring report with verified emission reductions, leakage treatment, and a clear explanation of the crediting-period discrepancy.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No VVB-confirmed additionality found
No reversal treatment stated
Leakage not addressed
Project baseline, reassessed in 2015
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →