Clean Bricks Production in Nepal

VCS-3228 ↗

#10of 14 in Nepal#459of 629 in Verra (VCS)#5of 8 in AMS-III.Z

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A VCS-registered clean bricks manufacturing project in Nepal with a VVB-confirmed combined additionality test and standardised methodology (AMS-III.Z v6.0), but hampered by an unresolved double-counting risk with a similar CDM PoA, absence of any monitoring-period verification data, and a project-specific baseline with no reassessment record. The low extraction confidence and lack of verified ERR figures limit confidence in the project's actual performance.

Red Flags

  • Double-counting risk with CDM PoA (ref no. 10722) identified as a material finding in the validation report; corrective action to verify no overlapping VCU claims was raised but no evidence of resolution was found in the extracted record.
  • No monitoring-period data or verified ERR figures were found in any available document, leaving the project's actual emissions reductions unconfirmed.
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable, reducing reliability of the extracted facts.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer-pool data; avoidance project

Leakage

Quantified but deduction % not stated

Baseline

Project-specific; no reassessment record

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CDM overlap risk; CORSIA/CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-III.Z

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents