Corredor dos Senandes CDM Project
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.
missing Leakage treatment is inconsistent across documents and appears not addressed in the monitoring report, which can inflate credited reductions.
Transparency
verified The VVB is identified (Lloyd’s Register Quality Assurance Limited) and the monitoring period is clearly stated (2014-07-01 to 2020-12-31).
missing The extracted record lacks a verified ER total and contains contradictory claimed ER figures, reducing auditability.
Claim Safety
verified The project is stated as not CORSIA-eligible, reducing aviation-claim channel risk.
missing Over-crediting risk is elevated by contradictory ER totals and unclear leakage handling, and CCP status is not stated in available documents.
Documentation
verified Multiple document types are referenced (monitoring report, validation report, financial) with high extraction confidence and 8 documents used.
missing Safeguards and leakage information are inconsistent between documents, indicating documentation coherence issues.
Detailed Analysis
Integrity
Additionality appears reasonably robust because the extracted record indicates the VVB confirmed additionality using an investment test (validation/verification documentation referenced). Baseline setting is project-specific under ACM0002, and the timing of any baseline reassessment was not found in the extracted record, which weakens confidence in baseline continued appropriateness. Leakage is a key weakness: the monitoring report (2021-08-12) indicates leakage was not addressed, while another (2011) source suggests leakage was quantified, creating uncertainty about whether credited ERs include appropriate leakage treatment. No material findings or corrective actions are reported in the monitoring report (2021-08-12), which is a positive signal but does not resolve the leakage and baseline gaps.
Transparency
Core MRV descriptors are present: the monitoring period is stated as 2014-07-01 to 2020-12-31 and the VVB is named as Lloyd’s Register Quality Assurance Limited (monitoring report, 2021-08-12). However, the extracted record does not include a verified total emission reduction figure, and the claimed ER total is internally contradictory, limiting traceability from monitoring to issuance. Several monitoring-related fields (such as usage monitoring method) were not found in the extracted record, reducing replicability of calculations.
Claim Safety
The project is explicitly stated as not CORSIA-eligible, which reduces the risk of high-profile aviation-related claims (monitoring report, 2021-08-12). Nonetheless, greenwashing/over-crediting risk is elevated because the monitoring report date contains two different claimed ER totals and there is no verified ER total captured in the extracted record. Leakage handling is unclear due to conflicting statements (not addressed vs quantified), and CCP status was not found in the extracted record, leaving uncertainty for high-integrity claim frameworks.
Documentation
Documentation coverage is moderate-to-good: the evidence list includes a monitoring report (2021-08-12), a validation report (2012-12-27), and financial documentation, with 8 documents used and high extraction confidence. However, coherence across documents is an issue because safeguards are described as present in the validation report but absent in the monitoring report, and leakage treatment is inconsistent across sources. The absence of extracted details on baseline reassessment and several MRV parameters indicates remaining evidence gaps despite the number of documents.
Overall
The main reliability concern is the contradiction in claimed emission reductions: 989,643 versus 78,789, both attributed to the monitoring report dated 2021-08-12. Because both values come from the same document type and date, neither can be confidently privileged; this inconsistency materially reduces confidence and drives down transparency and claim-safety scores. For safeguards, the validation report (2012-12-27) indicates safeguards were mentioned while the monitoring report (2021-08-12) indicates they were not; the more recent monitoring report was privileged for current-state assessment, but the contradiction still signals weak continuity of safeguards reporting. For leakage, the monitoring report (2021-08-12) stating leakage was not addressed was privileged over an older, unclear 2011 source labeled as unknown, but the discrepancy suggests potential methodological or reporting gaps and lowers integrity and claim safety.
Audit Analysis
The project shows moderate integrity for a renewable electricity CDM activity, with additionality confirmed by the VVB and no material findings or corrective actions reported. However, key MRV elements are weakened by internal inconsistencies in the claimed emission reductions and gaps around leakage treatment and safeguards documentation, increasing over-crediting and reputational risk.
Red Flags
- Two conflicting totals for claimed emission reductions appear within the same monitoring report date (989,643 vs 78,789), undermining MRV reliability.
- Leakage is marked as not addressed in the monitoring report, while another source indicates leakage was quantified (2011), creating uncertainty about whether leakage was properly treated.
Credit Vintages
Nessuna emissione registrata sul registro.
Il marketplace dichiara i vintage: 2013 (non verificato).
Cosa migliorerebbe questo punteggio
- Provide the VVB verification statement and the final verified ER total for the 2014-07-01 to 2020-12-31 monitoring period, reconciling the 989,643 vs 78,789 discrepancy with a clear calculation trail.
- Document leakage assessment explicitly under ACM0002 for the monitoring period (including any quantified deduction or justified insignificance) and align safeguards reporting between validation and monitoring documentation (FPIC, grievance mechanism, and safeguard measures).
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversals reported
Leakage unclear/inconsistent
Project-specific baseline; reassessment not evidenced
Safeguards inconsistently documented
Not CORSIA-eligible
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →