CPA-KE-012-Kenya Samsung Project

GS-4260 ↗ · current registry ID: GS11693

#116of 202 in Industrial#25of 42 in Kenya#282of 426 in Gold Standard (GS)#15of 26 in AMS-I.E

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A Gold Standard household cooking-fuel efficiency project in Kenya with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by four open corrective actions, a CDM-to-GS transfer that raises double-counting concerns, three sibling PoA projects delisted for faults, and ten material contradictions across the document set. The verified ERR figure is internally inconsistent (7.35 vs 359,719 tCO₂e across two monitoring reports), casting doubt on the reliability of the MRV record.

Red Flags

  • Three sibling projects in the same PoA (CPA-KE-008, CPA-KE-009, CPA-KE-001) were delisted due to faults identified by SustainCERT, indicating systemic quality issues in the programme.
  • The project was transferred from CDM to Gold Standard and design-certified in 2024, creating a material double-counting risk if CDM credits were already issued for the same period.
  • Four corrective actions (CAR 01–04) were raised during verification, and the renewal of the crediting period was blocked by non-rule-based issues raised by SustainCERT.
  • The verified ERR figure is contradictory: one monitoring report (2022-10-31) records 359,719 tCO₂e while a later one (2023-08-25) records only 7.35 tCO₂e, a discrepancy of five orders of magnitude that cannot be reconciled.
  • No buffer pool percentage is stated in any available document, leaving permanence risk unquantified for the crediting period.

Credit Vintages

IssuedRetiredAvailable
2021
102,7200102,720
2022
85,553085,553
Total188,2730188,273

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; reversal risk unquantified

Leakage

5% quantified deduction applied

Baseline

Project-specific baseline, reassessed 2023

Safeguards

FPIC contradictory; grievance mechanism present

Double-claim

CDM-to-GS transfer; CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.E.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents