Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalUnited States Registry: RegisteredGeneral Methodologyv2.0

Davidson County Landfill

VCS-2414 ↗

#10of 115 in United States#277of 629 in Verra (VCS)

5.5/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The Davidson County Landfill project is a VCS-registered landfill gas capture project using the CAR Landfill Protocol v6.0, verified by GHD Limited. Additionality is confirmed via a VVB-verified performance test and the baseline is measured and project-specific, but the most recent verification report does not address leakage (0% deduction with no justification), no buffer pool percentage is stated, and eleven corrective action requests—including a substantive error in the destruction efficiency applied to engine calculations—raise concerns about MRV robustness. The project delivered approximately 102% of its pro-rata ex-ante expectation for the 2024 monitoring period, indicating reasonable claim alignment.

Red Flags

  • Eleven corrective action requests in the 2025 verification report, including an incorrect 96% destruction efficiency applied to engine emission reduction calculations, indicating substantive MRV calculation errors that were caught and corrected
  • Leakage deduction of 0% with justification listed as 'not addressed' in the most recent verification report (2024-11-12), while an earlier verification report (2022-08-24) had quantified leakage—suggesting the project dropped its leakage quantification without explanation
  • No buffer pool percentage stated in any available document, leaving permanence risk unquantified for a project with a 7-year crediting period
  • FPIC status contradicts between the monitoring report (not conducted) and the most recent verification report (conducted), creating uncertainty about free, prior, and informed consent

Credit Vintages

IssuedRetiredAvailable
2015
36,15936,1590
2016
54,493054,493
2017
43,711043,711
2018
51,59049,3882,202
2019
55,04955,0490
2020
48,57048,5700
2021
49,291049,291
2022
60,886060,886
2023
58,596058,596
2024
51,238051,238
Total509,583189,166320,417

Risk Indicators

Additionality

VVB-confirmed performance test

Permanence

No buffer pool stated; no reversals reported

Leakage

0% deduction, not addressed in latest VR

Baseline

Project-specific, measured, reassessed 2022

Safeguards

FPIC and grievance confirmed in 2025 VR but contradicted in

Double-claim

CORSIA explicitly not eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents