Skip to main content
VCSAgriculture Forestry and Other Land UseSouth Africa Registry: RegisteredAR-ACM0003

Eastern Cape Bamboo Forestry Project, South Africa

VCS-3632 ↗

#45of 66 in Soil carbon#11of 12 in South Africa#557of 629 in Verra (VCS)#20of 26 in AR-ACM0003

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.5
Documentation
3.5

Audit Analysis

The Eastern Cape Bamboo Forestry Project is in a very early stage of its crediting period, with the validation report (September 2025) still listing nine material findings to be resolved at first verification. A 16% buffer pool and VVB-confirmed additionality provide a reasonable integrity foundation, but the absence of FPIC, a contradictory leakage justification, and a 22-fold discrepancy between the PDD and validation-report ERR figures raise significant data-reliability concerns. The low extraction confidence across 13 documents further limits confidence in the extracted record.

Red Flags

  • FPIC was not conducted, a critical safeguard gap for a community-adjacent forestry project in South Africa
  • The PDD (2022) reports a lifetime ERR of 9,208,079 tCO₂e while the validation report (2025) reports 408,707 tCO₂e — a 22-fold discrepancy that cannot be reconciled from the available documents
  • Leakage is recorded as 0% and 'deemed negligible,' yet FAR 05 in the validation report explicitly requires verification of leakage from displacement of grazing activities at the next monitoring cycle
  • Nine material findings (FARs) remain open, including project ownership proof, stakeholder consultation evidence, and species-specific allometric equations, all deferred to first verification
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the extracted values may be unreliable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

16% buffer, no reversals yet, project very new

Leakage

0% deduction contradicted by open FAR on grazing displacemen

Baseline

Project-specific baseline, reassessment date not stated

Safeguards

FPIC not conducted; grievance mechanism present but inconsis

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents