Electric Power Generation from Renewable Sources – Barra da Paciência, Ninho da Águia, Corrente Grande, Paiol, São Gonçalo and Várzea Alegre Small Hydropower Plants

CDM-3897 ↗

#1453of 1935 in Renewable energy#141of 211 in Brazil#1198of 1459 in CDM (UNFCCC)#1113of 1287 in ACM0002

4.4/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A six-site small hydropower project in Brazil with a jurisdictional baseline and VVB-confirmed additionality, but the validation report identified four material findings including calculation errors in power densities and equipment capacity that raise over-crediting concerns. No monitoring reports or verified emission reductions are available, leaving the claimed 89,748 tCO2e unverified. The project's fundamental design is sound, but documentation gaps and unresolved calculation issues limit confidence.

Red Flags

  • Validation report (Nov 2020) identified four material findings including incorrect power density calculations, non-compliant TEG monitoring description, and equipment capacity in the PDD not matching nameplates — all directly affecting the emission reduction calculation
  • No monitoring reports or verified emission reduction figures are available in the extracted record, leaving the claimed 89,748 tCO2e entirely unverified
  • Contradiction in leakage treatment: the validation report states leakage was 'deemed negligible' while another document references a 'quantified' approach, creating ambiguity about the actual leakage deduction basis
  • Three corrective actions were required to fix PDD errors (fixed parameters, power density calculations, installed capacity), indicating the project documentation was not fully accurate at validation

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Renewable energy – no reversal risk

Leakage

0% deduction, justification contradicted

Baseline

Jurisdictional, reassessed 2020

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents