Elmali Wind Power Plant (WPP)
GS-787 ↗ · current registry ID: GS4442
#106of 770 in Renewable energy#23of 121 in Turkey#41of 426 in Gold Standard (GS)#74of 383 in ACM0002
Audit Analysis
The Elmali Wind Power Plant is a straightforward renewable-energy project under Gold Standard with VVB-confirmed additionality (combined investment and regulatory test) and inherent permanence advantages of a wind asset. However, a contradiction in the reported baseline method between two verification reports, a low extraction confidence across the document set, and the absence of FPIC documentation introduce moderate uncertainty. The project is in the process of transitioning from its first crediting period (2019–2026) to a second (2026–2033), with a new validation completed in early 2026.
Red Flags
- Baseline method is reported as 'project-specific' in the 2024 verification report but as 'jurisdictional' in the 2022 verification report — an unexplained inconsistency that undermines confidence in the baseline calculation.
- Minimum extraction confidence across the document set is rated low, meaning at least one key document was poorly readable and some facts may be incomplete or misread.
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project's presence in a local community in Turkey.
- One of the six evidence document types is listed as 'unknown', indicating a gap in the documentation trail.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 41,490 | 40,660 | 830 | |
| 2020 | 51,321 | 46,186 | 5,135 | |
| 2021 | 51,980 | 5,411 | 46,569 | |
| 2022 | 51,760 | 421 | 51,339 | |
| 2023 | 43,042 | 0 | 43,042 | |
| 2024 | 21,866 | 0 | 21,866 | |
| Total | 261,459 | 92,678 | 168,781 |
Risk Indicators
VVB-confirmed combined test
Wind – no storage risk
0 % – deemed negligible
Method inconsistent across reports
Grievance present, FPIC absent
CORSIA / CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →