Energía Renovable Tacuarembó 10 MW Biomass Power Generation
#5of 180 in Biomass#1of 10 in Uruguay#66of 1453 in CDM (UNFCCC)#28of 393 in AMS-I.D
Audit Analysis
A 10 MW biomass power generation project in Uruguay under CDM with a confirmed barrier-test additionality assessment by TÜV Rheinland and a jurisdictional grid-emission-factor baseline. The project over-delivered relative to its ex-ante estimate (verified ERR roughly 4× the validation-report figure), which is conservative for claim safety, but several operational monitoring parameters (leakage percentage, FNRB, usage monitoring method) are absent from the extracted record, limiting full verification of the MRV chain.
Red Flags
- Leakage is described as 'quantified' in the monitoring report but no specific deduction percentage is stated in any available document, leaving the magnitude of the leakage adjustment unverifiable.
- Baseline method is characterised as 'jurisdictional' in the 2022 monitoring report but as 'project' in the 2012 validation report; the discrepancy is not reconciled in the extracted record.
- Total verified ERR is not stated as a separate figure in the monitoring report; only the claimed ERR of 165,926 tCO₂e is available, preventing an independent cross-check of the verification calculation.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
Energy generation – no reversal risk
Quantified but no value stated
Jurisdictional EF; method label inconsistent across docs
Safeguards mentioned; FPIC and grievance mechanism not detai
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →