Enkima stoves

GS-3340 ↗ · current registry ID: GS11319

#34of 202 in Industrial#8of 42 in Kenya#108of 426 in Gold Standard (GS)

5.7/ 10
Integrity
5.8
Transparency
5.5
Claim Safety
5.8
Documentation
5.5

Audit Analysis

The Enkima Stoves project (Gold Standard, Kenya) has a well-established additionality case confirmed by KBS Certification Services and a quantified 5% leakage deduction, but is significantly under-delivering relative to its ex-ante estimates due to poor uptake of the initial Hifadhi stove design. Multiple corrective actions and conditions of listing remain open, and the verified usage rate (29.1% overall) is far below the 95% assumed at validation, raising questions about the robustness of the original monitoring plan. The project adapted by introducing Sunken stoves with 90% usage, and is reporting actual (lower) emissions, which limits over-crediting risk.

Red Flags

  • Verified overall usage rate of 29.1% (monitoring report, 2025) is roughly one-third of the 95% assumed at validation, indicating the ex-ante monitoring plan was significantly mis-specified
  • Multiple open corrective actions (CAR 01–05) and conditions of listing (CL 01–02) remain unresolved, including the need to conduct a pKPT for both stove models and submit a deviation request for delayed monitoring
  • Total verified ERR figure is not stated in the extracted record; only the claimed figure of 56,041 tCO₂e for the monitoring period is available, making independent verification of the credit quantity impossible from the available documents
  • The verification report (2026) marks reversal events as 'not addressed' while the monitoring report (2025) states none were reported — the topic was not explicitly evaluated in the verification

Credit Vintages

IssuedRetiredAvailable
2022
2,91302,913
2023
10,939010,939
2024
33,115033,115
2025
9,07409,074
Total56,041056,041

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Energy-efficiency; no reversal events reported

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment yet due

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents