Skip to main content
GSWindTurkeyACM0002

Fuatres Wind Power Plant, Turkey

GS-1633 ↗ · current registry ID: GS2543

#53of 770 in Renewable energy#13of 121 in Turkey#18of 426 in Gold Standard (GS)#36of 383 in ACM0002

6.5/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
6.5
Documentation
6.0

Audit Analysis

The Fuatres Wind Power Plant is a Gold Standard wind project with VVB-confirmed investment additionality, a jurisdictional baseline, and no reversal risk inherent to the avoidance-type activity. The 2024 monitoring period verified 112,043 tCO2e, and all corrective actions from the verification were closed out before report issuance. However, several pending corrective actions remain, key parameters (FNRB, usage rates, CORSIA/CCP status) are not stated in the extracted record, and multiple inter-document contradictions—largely attributable to sequential crediting periods—reduce confidence in data consistency.

Red Flags

  • Seven corrective actions remain open at the time of the verification report (social security records, legal contest declarations, meter calibration dates, SDG impact baselines, complete ER spreadsheet, and the 2023 annual report), indicating the MRV record is not yet fully closed.
  • The verification report (March 2024) recorded reversal events as 'not addressed' while the later monitoring report (December 2025) states none were reported; the earlier gap suggests the reversal assessment was not systematically performed in the first verification cycle.
  • FNRB value, usage monitoring method, and CORSIA/CCP eligibility are all absent from the extracted record, leaving material parameters unverified for claim-safety assessment.

Credit Vintages

IssuedRetiredAvailable
2017
8,3538,3530
2018
49,1456,61542,530
2019
49,72510,76838,957
2020
50,880050,880
2021
55,11316,42538,688
2022
55,080055,080
2023
47,758047,758
Total316,05442,161273,893

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal events

Leakage

0% deduction, deemed negligible, no sensitivity analysis

Baseline

Jurisdictional baseline, 2025 reassessment

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.