Fuhui Inner Mongolia Tugurige Wind Farm Project
#764of 1935 in Renewable energy#375of 1084 in China#542of 1459 in CDM (UNFCCC)#592of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in Inner Mongolia with a jurisdictional baseline and VVB-confirmed additionality, but significant gaps in monitoring data, safeguards documentation, and a notable discrepancy between the PDD and validation report on total emissions reductions. The project is low-risk in technology terms but the evidentiary record is incomplete.
Red Flags
- ERR contradiction: the PDD (Sept 2019) states 702,366 tCO₂e while the validation report (Nov 2019) states 100,338 tCO₂e — a 7× difference that is not explained in the extracted record
- No monitoring period, usage rate, or FNRB value is stated in any available document, leaving the MRV chain unverifiable
- FPIC and grievance mechanism are not documented despite safeguards being mentioned in the validation report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 52,538 | 0 | 52,538 | |
| 2010 | 127,182 | 0 | 127,182 | |
| 2012 | 124,878 | 0 | 124,878 | |
| 2014 | 173,821 | 0 | 173,821 | |
| Total | 478,419 | 0 | 478,419 |
Risk Indicators
VVB-confirmed
Avoidance project, no reversal risk
Negligible, justified for wind
Jurisdictional, reassessed 2019
Mentioned but FPIC/grievance undocumented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →