Rated
Gimcheon PV Power Plant Site 2 CDM Project
- Standard
- CDM
- Methodology
- AMS-I.D (CDM)
- Registry
- CDM-2684 ↗ · Registered
- Country
- South Korea
- Credit type
- Solar
- Developer
- Samsung Everland Inc
CarbonMeld's document-based rating gives Gimcheon PV Power Plant Site 2 CDM Project (CDM-2684) 3.1 out of 10 (Very low rating) under CarbonMeld methodology v3, documents read on 10 Oct 2026. The analysis read 9 of the 11 registry documents. It is CarbonMeld's own assessment, not a rating given by the registry or the standard.
Assessment
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record and our analysis.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 12,169 | 0 | 12,169 | |
| 2018 | 4,326 | 0 | 4,326 | |
| Total | 16,495 | 0 | 16,495 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2009–2011AMS-I.Dversion not confirmed in the document text
monitoring report
2011AMS-I.Dversion not confirmed in the document text
monitoring report
- AMS-I.D: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Cite this page
CarbonMeld (2026). Gimcheon PV Power Plant Site 2 CDM Project (CDM-2684): CarbonMeld document-based rating, methodology v3, documents read on 10 Oct 2026. https://carbonmeld.com/projects/gimcheon-pv-power-plant-site-2-cdm-project/.
The citation names the rating by its methodology version and the day the documents were read.
Similar projects
Same methodology or sector, the same registry first.
- 4.25MW grid connected wind farm by Avaneetha Textiles (P) Ltd., Tamil Nadu, India at village Andipatti taluk, Uthamapalayam taluk & Teni taluk, Teni District. Tamil nadu. India by M/S Avaneetha Textiles (P) LtdCDM-9601
- Indur 7.5 MW Non-Conventional Renewable Sources Biomass Power ProjectCDM-0391
- Bundled Wind Power Project activity by Muthoot Fincorp LimitedCDM-9232
- 2.4 MW Wind Power Project at Tirunelveli Dist., TamilnaduCDM-5234
- 6.6 MW Bundled Wind Power Project in Tamil NaduCDM-9561
- 9.9 MW Bundled Wind Power Project in Maharashtra by REI Agro LimitedCDM-4475
- Huadian Ningxia Ningdong Yangjiayao Wind Farm Expansion ProjectCDM-4914
- 2.75 MW Wind Power Project at Marudhar Fashions.CDM-5874