Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Brazil Registry: RegisteredAMS-I.E

Gomes de Mattos Ceramic Fuel Switching Project

VCS-64 ↗

#24of 202 in Industrial#13of 104 in Brazil#208of 629 in Verra (VCS)#6of 26 in AMS-I.E

5.8/ 10
Integrity
5.5
Transparency
6.5
Claim Safety
5.5
Documentation
6.0

Audit Analysis

The Gomes de Mattos Ceramic Fuel Switching Project is a VCS-registered industrial fuel-switching project in Brazil with a solid additionality assessment (barrier test confirmed by RINA) and low inherent permanence risk as an avoidance credit. However, the project carries notable integrity concerns stemming from a 2011 verification finding that large quantities of native wood biomass may have originated from agricultural clearing rather than sustainable management, a +98% over-estimation in one monitoring period, and numerous corrective action requests across multiple reporting cycles. The current crediting period (2016–2026) shows consistent claimed and verified ERR of 155,547 tCO2e, but the earlier PDD claimed 479,970 tCO2e, a threefold difference that warrants scrutiny.

Red Flags

  • CAR 09 (2011 verification) flagged that large volumes of native wood biomass (11,145 mst from Faz. Boqueirão, 7,190 mst from Faz. Pau D'Arco) may have been sourced from agricultural land clearing rather than sustainable forest management, raising doubts about renewable-biomass eligibility under AMS-I.E.
  • CAR 08 (2011 verification) identified a +98% over-estimation of emission reductions in one monitoring period (88,847 tCO2e calculated vs. 44,875 tCO2e expected pro-rata), with no explanation provided.
  • The PDD (2018) claims 479,970 tCO2e over the crediting period while the 2024 verification report states 155,547 tCO2e — a threefold discrepancy that is not clearly reconciled in the extracted record.
  • No buffer pool percentage or reversal-event history is stated in any available document, leaving permanence safeguards unverified for the current crediting period.
  • The enterprise lacks a formal environmental management system, water-consumption controls, and atmospheric-emission monitoring, as noted in the 2024 verification report's material findings.

Credit Vintages

IssuedRetiredAvailable
2006
32,58232,5820
2007
43,98543,9850
2008
52,10152,1010
2009
46,05346,0530
2010
57,70557,7050
2011
60,08360,0830
2012
63,79763,7970
2013
57,58657,5860
2014
56,89056,8900
2015
56,35646,06610,290
2016
48,12529,06419,061
2017
33,15516,57716,578
Total608,418562,48945,929

Risk Indicators

Additionality

Barrier test confirmed by RINA

Permanence

Avoidance project, low reversal risk

Leakage

0% deduction, quantified justification

Baseline

Project-specific, reassessed 2018

Safeguards

FPIC and grievance present (2024), gaps in earlier periods

Double-claim

CORSIA excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.E

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents