Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.0

GS 10959 VPA01 Safe Water Project in Rwanda I

GS-3085 ↗ · current registry ID: GS11098

#93of 202 in Industrial#7of 12 in Rwanda#239of 426 in Gold Standard (GS)

5.1/ 10
Integrity
4.8
Transparency
5.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A Gold Standard energy-efficiency project displacing thermal energy for water purification in Rwanda, with VVB-confirmed additionality and no reported reversals, but burdened by an extensive list of material findings, five outstanding corrective actions, a project-specific baseline, and a double-claiming concern flagged by the VVB. The 100% usage rate with no discount and CORSIA eligibility introduce moderate over-crediting and dual-channel risk.

Red Flags

  • Five corrective actions remain outstanding, including confirmation of legal carbon-rights ownership and evidence of community authorization
  • VVB flagged a double-claiming risk: the project must ensure the next usage survey covers alternative water purification access to avoid double claiming (FAR from MP1)
  • No buffer pool percentage is stated in any available document, leaving permanence risk unquantified
  • The monitoring report (Dec 2025) describes leakage as 'quantified' while the verification report (Jul 2025) states it is 'deemed negligible' — an unresolved inconsistency
  • An obsolete fNRB default value was used initially and had to be corrected (CAR#02), raising questions about the robustness of the original calculation

Credit Vintages

IssuedRetiredAvailable
2021
4,4203,712708
2022
52,17717,27134,906
2023
59,057059,057
2024
32,675032,675
Total148,32920,983127,346

Risk Indicators

Additionality

VVB-confirmed

Permanence

No buffer pool stated

Leakage

Negligible, justified

Baseline

Project-specific, no reassessment date

Safeguards

Grievance present, FPIC not stated

Double-claim

CORSIA-eligible, VVB FAR on overlap

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents