Guangdong Zhanjiang Yangqian 49.5MW Wind Power Project
#435of 1935 in Renewable energy#169of 1084 in China#281of 1459 in CDM (UNFCCC)#323of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Guangdong, China, validated under CDM methodology ACM0002 v17.0 with a jurisdictional baseline and a 7-year crediting period (2017–2024). The project presents low inherent risk given the wind technology, but the extracted record is limited to the validation phase, leaving additionality test details, monitoring data, and CORSIA/CCP eligibility unconfirmed. No contradictions were found and the single material finding (a missing flow diagram in the PDD) is minor.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving a gap in confirming the additionality assessment was properly documented
- No monitoring or verification reports appear in the evidence set; only the validation report (Dec 2016) and PDD are available, so actual performance against the 438,914 tCO₂e claim cannot be independently confirmed
- CORSIA eligibility and CCP status are not stated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 55,255 | 0 | 55,255 | |
| 2012 | 71,325 | 0 | 71,325 | |
| 2013 | 78,041 | 0 | 78,041 | |
| Total | 204,621 | 0 | 204,621 |
Risk Indicators
Test type not stated in extracted record
Wind generation – low reversal risk
0% deemed negligible – reasonable for wind
Jurisdictional, reassessed 2016
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →