Guangxi Qiaogong Hydropower Project
#1247of 1935 in Renewable energy#731of 1084 in China#973of 1459 in CDM (UNFCCC)#967of 1287 in ACM0002
Audit Analysis
The Guangxi Qiaogong Hydropower Project is a CDM-registered small hydro scheme using a jurisdictional baseline and ACM0002 methodology, with a reasonable 0% leakage deduction for grid-displacement. However, key verification details (additionality test type, verified ERR, FNRB, usage monitoring) are absent from the extracted record, and a minor material finding regarding PDD parameter documentation was noted without corrective action. The project is functional but lacks the depth of evidence needed for high confidence.
Red Flags
- Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality claim unverified in the extracted record
- No verified ERR figure is available to cross-check against the 5,659,906 tCO2e lifetime claim, preventing any delivery assessment
- FPIC and grievance mechanism are not documented, creating a safeguards gap for a community-adjacent hydro project in China
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 655,465 | 0 | 655,465 | |
| Total | 655,465 | 0 | 655,465 |
Risk Indicators
Test type and VVB confirmation not stated in available docum
Avoidance project (grid displacement); no reversal events re
0% deduction, deemed negligible—consistent with small hydro
Jurisdictional baseline with 2017 grid EF; reassessment 2019
Safeguards mentioned and benefit sharing described, but FPIC
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →