Guizhou Jinsha Changxing CMM Power Generation Project

VCS-5470 ↗

#53of 64 in Methane#175of 204 in China#560of 629 in Verra (VCS)#13of 16 in ACM0008

4.2/ 10
Integrity
3.0
Transparency
5.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A CMM power generation project in China with VVB-verified additionality and a recent verification report, but undermined by a direct contradiction on whether methane capture is legally required, a first monitoring period delivering only ~45% of the pro-rata PDD expectation, and a thin 0% leakage justification. The project-specific baseline and two material findings with corrective actions further moderate confidence in the credit quality.

Red Flags

  • Contradiction between the PDD (capture not legally required) and the monitoring report (capture legally required) directly undermines the additionality claim; if capture is mandated, the project may not be additional.
  • First monitoring period verified ERR of 131,702 tCO2e is only ~45% of the pro-rata expectation (~292,000) derived from the PDD lifetime estimate of 1,522,900 tCO2e over 10 years, signalling potential over-crediting in the ex-ante estimate.
  • Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis, which is thin for a CMM project where unutilised methane could be flared or vented.
  • Two material findings in the verification report (missing stakeholder identification process; inconsistent waste-heat description) required corrective actions in the Joint PD & MR.
  • Gas capture legally mandated — additionality in doubt

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified but legal-capture contradiction unresolved

Permanence

Avoidance project; no reversal risk applicable

Leakage

0% deduction with only 'deemed negligible' justification

Baseline

Project-specific, modelled; reassessment not yet due (10-yr

Safeguards

FPIC conducted, grievance mechanism present, benefit sharing

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0008

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents