Guizhou Jinsha Changxing CMM Power Generation Project
#53of 64 in Methane#175of 204 in China#560of 629 in Verra (VCS)#13of 16 in ACM0008
Audit Analysis
A CMM power generation project in China with VVB-verified additionality and a recent verification report, but undermined by a direct contradiction on whether methane capture is legally required, a first monitoring period delivering only ~45% of the pro-rata PDD expectation, and a thin 0% leakage justification. The project-specific baseline and two material findings with corrective actions further moderate confidence in the credit quality.
Red Flags
- Contradiction between the PDD (capture not legally required) and the monitoring report (capture legally required) directly undermines the additionality claim; if capture is mandated, the project may not be additional.
- First monitoring period verified ERR of 131,702 tCO2e is only ~45% of the pro-rata expectation (~292,000) derived from the PDD lifetime estimate of 1,522,900 tCO2e over 10 years, signalling potential over-crediting in the ex-ante estimate.
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis, which is thin for a CMM project where unutilised methane could be flared or vented.
- Two material findings in the verification report (missing stakeholder identification process; inconsistent waste-heat description) required corrective actions in the Joint PD & MR.
- Gas capture legally mandated — additionality in doubt
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but legal-capture contradiction unresolved
Avoidance project; no reversal risk applicable
0% deduction with only 'deemed negligible' justification
Project-specific, modelled; reassessment not yet due (10-yr
FPIC conducted, grievance mechanism present, benefit sharing
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →