Gunder Hydro Power Project, Turkey

VCS-912 ↗

#49of 121 in Turkey#230of 629 in Verra (VCS)#158of 383 in ACM0002

5.7/ 10
Integrity
5.6
Transparency
6.2
Claim Safety
5.1
Documentation
5.8

Audit Analysis

Evidence scope is partial: the registry-linked validation report is public, but the available documents are old and I do not see a recent monitoring/verification cycle. The project has some audited support for additionality and compliance, but claim safety is limited by age and the lack of recent public MRV.

Red Flags

  • Third-party evidence is dated (validation report from 2012); no recent public monitoring/verification cycle visible
  • No public evidence of issuance/retirement history or buyer claim guidance in the materials provided
  • No evidence of CCP eligibility, Article 6 authorization, or corresponding adjustment

Credit Vintages

IssuedRetiredAvailable
2012
11,63448911,145
2013
30,3715,20125,170
2014
16,6171,51515,102
2015
30,49660029,896
2016
17,95719017,767
2017
33,557033,557
2018
27,795027,795
2019
45,53760044,937
2020
37,5916,89930,692
2021
19,44714,3845,063
Total271,00229,878241,124

Risk Indicators

Additionality

documented evidence

Permanence

low reversal risk for run-of-river hydro

Leakage

no major leakage issue evident

Baseline

baseline methodology identified, but not recently reassessed

Safeguards

some environmental/social validation, but limited current MR

Double-claim

registry framework present, but claim authorization evidence

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-04-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents