VCSEnergy industries (renewable/non-renewable sources)Argentina Registry: RegisteredACM0002

GENNEIA WIND PROJECTS IN ARGENTINA

VCS-1987 ↗

#242of 770 in Renewable energy#2of 6 in Argentina#283of 629 in Verra (VCS)#189of 383 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Gennea Wind Projects in Argentina is a registered VCS renewable energy project with VVB-confirmed additionality and no inherent reversal risk, but the verification record reveals significant data-quality issues: nine cross-document contradictions, a material discrepancy between project-reported and CAMMESA/SMEC generation data (CAR 01), and a leakage justification that regressed from 'deemed negligible' to 'not addressed' between the 2024 and 2025 verification reports. The project is fundamentally low-risk in design (wind displacing grid electricity), yet the documentation inconsistencies and unresolved corrective actions temper confidence in the reported emission reductions.

Red Flags

  • CAR 01: Hourly net electricity generation records for Chubut Norte I & II (Nov–Dec) and Pomona I & II (Jan) did not match CAMMESA/SMEC system data used in ER calculations, indicating potential over-reporting of generation in the 2024 monitoring period.
  • Nine contradictions across the document set, including baseline method (project vs jurisdictional), leakage justification (deemed negligible vs not addressed), and ERR figures (444,180 vs 391,812), raising data-reliability concerns.
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent (Oct 2025) verification report, a regression from the 2024 report's 'deemed negligible' statement.
  • Ten corrective actions remain open, including missing meter calibration data, incomplete grievance tables, and incorrect equation references in the PDD.

Credit Vintages

IssuedRetiredAvailable
2018
16,96416,9640
2019
278,528278,5280
2020
375,872374,7731,099
2021
384,405276,688107,717
2022
420,346101,063319,283
2023
200,9534,234196,719
Total1,677,0681,052,250624,818

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind energy – no reversal risk

Leakage

0% deduction, justification not addressed (2025)

Baseline

Project-specific, method contradicted in records

Safeguards

FPIC & grievance present but inconsistently documented

Double-claim

CORSIA excluded; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents