Hydroelectric Project In Kinnaur District In Himachal Pradesh

VCS-1742 ↗

5.1 / 10
Integrity
5.2
Transparency
5.0
Claim Safety
4.6
Documentation
6.1

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB and is based on an investment test (monitoring report, 2024-11-21).

missing Leakage treatment is inconsistent across monitoring reports and is not addressed in the latest monitoring report, with no leakage deduction stated (monitoring report, 2024-11-21; monitoring report, 2018-04-17).

Transparency

verified VVB is identified (LGAI Technological Center, S.A. / Applus+) and a specific monitoring period is stated (2022-08-01 to 2022-12-31) (monitoring report, 2024-11-21).

missing MRV transparency is weakened by many corrective actions and missing evidence (e.g., calibration certificates, invoices/JMR, breakdown details) (monitoring report, 2024-11-21).

Claim Safety

verified Uses an established CDM/VCS methodology for grid-connected renewable electricity (ACM0002 v12.1.0) with a stated grid emission factor (monitoring report, 2024-11-21).

missing Over-crediting/claims risk is elevated due to contradictory ERR figures and unresolved requests to justify increased ERs and IRR benchmark non-breach (monitoring report, 2024-11-21; validation report, 2023-03-31; monitoring report, 2021-09-20).

Documentation

verified A relatively large document set was available (24 documents including PDD, monitoring reports, validation report, and issuance) with high extraction confidence.

missing Despite the document set, the latest monitoring report indicates key primary evidence was not provided to the auditor (e.g., commissioning/PPA/O&M documents, meter calibration certificates) (monitoring report, 2024-11-21).

Detailed Analysis

Integrity

The project’s additionality is relatively stronger than many renewable projects because the VVB confirms additionality and the project applies an investment test (monitoring report, 2024-11-21). However, baseline setting is project-specific and the timing of any baseline reassessment is not stated in the extracted record, which increases uncertainty for a long crediting period. Leakage is a notable weakness: the latest monitoring report does not address leakage and no deduction is stated, while an earlier monitoring report indicates leakage was quantified, creating reliability concerns (monitoring report, 2024-11-21; monitoring report, 2018-04-17).

Transparency

Core MRV elements are partially transparent: the VVB is named and the monitoring period is clearly defined (2022-08-01 to 2022-12-31) (monitoring report, 2024-11-21). Transparency is materially reduced by the volume of corrective actions indicating missing or inconsistent evidence for generation, downtime, invoices/JMR, and meter calibration certificates (monitoring report, 2024-11-21). The large gap between claimed and verified ERs further reduces confidence in the clarity and consistency of reporting across documents.

Claim Safety

Claim safety is constrained by over-crediting risk signals in the latest monitoring report, including requests to justify increased emission reductions versus estimates and to explain how IRR benchmarks are not breached (monitoring report, 2024-11-21). The project uses ACM0002 and reports a grid emission factor of 0.8031, which supports methodological plausibility, but the inconsistent ERR figures across documents create a heightened risk that public claims could be overstated or confusing (monitoring report, 2024-11-21; validation report, 2023-03-31; monitoring report, 2021-09-20). CORSIA eligibility and CCP status are not stated in the extracted record, so buyers cannot rely on those labels to reduce greenwashing risk.

Documentation

The extracted record indicates a substantial documentation base (24 documents including PDD, monitoring report(s), validation report, and issuance) and the extraction confidence is high, which supports a mid-range documentation score. Nonetheless, the latest monitoring report explicitly notes that key supporting documents were not provided to the auditor (e.g., technical equipment details, commissioning certificates, PPAs, O&M agreement, breakdown logs, invoices/JMR, and calibration certificates) (monitoring report, 2024-11-21). These gaps suggest that, despite many documents existing, the evidentiary chain for MRV was incomplete at the time of assessment.

Overall

Overall quality is moderate-to-weak due to reliability issues and unresolved evidence gaps, despite VVB-confirmed additionality and use of a recognized methodology. Contradiction 1 (claimed ERs): I privilege the 2021 monitoring report figure (4,878,965) as the project’s claimed ERs because monitoring reports typically contain period-specific claims, but the inconsistency with the 2023 validation report (3,032,920) indicates poor consistency and lowers confidence. Contradiction 2 (leakage): I privilege the most recent statement that leakage is not addressed (monitoring report, 2024-11-21) over an older quantified approach (2018-04-17), because recency and current practice matter for present claims; this inconsistency reduces integrity/claim-safety. Contradiction 3 (additionality test type): I privilege the investment test as stated in the more recent record (monitoring report, 2023-03-17/2024-11-21) over the older “combined” description (2021-09-20), but the shift suggests documentation inconsistency. Contradiction 4 (verified ERs): I privilege the 2024 monitoring report verified value (1,361,528) over the 2023 validation report number (3,032,920) because verification outcomes should come from the latest monitoring/verification cycle; the mismatch is a major red flag for data reliability. Contradiction 5 (crediting period): I privilege the explicit 2013-01-01 to 2022-12-31 period in the 2024 monitoring report over the older validation report’s incomplete end date (2012-04-12), but the discrepancy indicates record-keeping weaknesses.

Audit Analysis

This VCS hydropower project shows some integrity strengths (VVB-confirmed additionality and a recognized grid-connected renewable methodology), but the monitoring/verification record contains significant evidence gaps and inconsistencies. Numerous corrective actions in the latest monitoring report and conflicting figures across documents increase over-crediting and reliability risk.

Project Description

The Karcham-Wangtoo Hydroelectric Project (KWHEP) is part of a larger effort by the Government of India and the Government of Himachal Pradesh to develop hydropower potential along the Sutlej River. The project, originally executed by Jaypee Karcham Hydro Corporation Limited, is now owned by the Himachal Baspa Power Company Ltd. No public comments were received during the comment period from 12 February - 14 March 2018.

Red Flags

  • Large inconsistencies across documents for claimed vs verified emission reductions (e.g., 4,878,965 claimed in a 2021 monitoring report vs 3,032,920 in a 2023 validation report; and 1,361,528 verified in a 2024 monitoring report vs 3,032,920 in the 2023 validation report).
  • Latest monitoring report lists extensive missing supporting evidence (e.g., PPAs/commissioning documents, breakdown logs, invoices/JMR, meter calibration certificates) and multiple inconsistencies with the approved PD/MR guidance.

Credit Vintages

Issued Retired Available
2014
3,403,883 109,000 3,294,883
2015
3,263,516 432,630 2,830,886
2016
3,484,652 3,431,425 53,227
2017
3,508,296 3,408,620 99,676
2018
3,163,013 2,562,180 600,833
2019
3,683,633 2,131,550 1,552,083
2020
3,505,143 415,094 3,090,049
2021
3,165,770 329,971 2,835,799
2022
3,010,154 140,000 2,870,154
Total 30,188,060 12,960,470 17,227,590

Cosa migliorerebbe questo punteggio

  • Publish/submit the missing primary evidence requested by the auditor (commissioning/PPA/O&M documents, complete invoices/JMR, breakdown logs, and full meter calibration certificates for the monitoring period) and close all corrective actions (monitoring report, 2024-11-21).
  • Reconcile and clearly explain the inconsistent claimed/verified ER totals across the validation and monitoring reports, including a transparent mapping of which figures correspond to which monitoring periods and issuance events.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal events reported

Leakage

Leakage inconsistently treated; latest report does not address

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti