Skip to main content
VCSEnergy demandUganda Registry: RegisteredVMR0006

Installation of high efficiency wood burning cookstoves in Uganda

VCS-2350 ↗

#12of 150 in Cookstoves#1of 163 in Uganda#124of 1339 in Verra (VCS)#11of 103 in VMR0006

6.2/ 10
Integrity
6.8
Transparency
6.2
Claim Safety
4.8
Documentation
7.0

Audit Analysis

A VCS cookstove project in Uganda with a well-verified combined additionality test and quantified 5% leakage deduction, but a project-specific baseline and a first-period delivery rate of only ~4% of the pro-rata expectation raise moderate over-crediting concerns. Documentation is reasonably complete with all corrective actions resolved, though several contradictions between the PDD, validation, and verification reports indicate the project underwent significant revisions before reaching its current verified state.

Red Flags

  • First monitoring period (6 months) delivered only ~4.3% of the pro-rata ex-ante expectation, suggesting either a very slow ramp-up or an overly optimistic lifetime estimate of 14.6 million tCO2e
  • Baseline is project-specific rather than jurisdictional, increasing sensitivity to assumptions about stove adoption and fuel displacement
  • Usage rate (assumed and verified) is not stated in any available document, leaving a key parameter unverified
  • CCP status is not stated, leaving dual-channel risk partially unassessed

Credit Vintages

IssuedRetiredAvailable
2021
95095
2022
31,450031,450
Total31,545031,545

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

5% quantified deduction

Baseline

Project-specific, not jurisdictional

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents