Audit Analysis
The BIM Wind Power project in Vietnam is a Gold Standard wind project with a VVB-confirmed investment additionality test and no open material findings, but it relies on a project-specific baseline, does not address leakage, and uses a 2020 grid emission factor that may overstate current reductions. The project delivered roughly 84% of its pro-rata expected reductions for the elapsed monitoring period, which is conservative. Low extraction confidence and an unidentified document in the evidence set limit overall assurance.
Red Flags
- Leakage is not addressed in any available document (no deduction, no justification), which is a gap even for a wind project where leakage is typically minimal
- Baseline method is project-specific per the 2024 verification report, less robust than a jurisdictional baseline; the PDD originally described it as jurisdictional, creating a discrepancy
- Grid emission factor of 0.823 tCO2/MWh is from 2020; if Vietnam's grid has decarbonised since, the actual emission reduction is lower than claimed
- Minimum extraction confidence is rated low, and one of the 11 evidence documents is unidentified ('unknown'), reducing assurance in the data record
- No buffer pool percentage is stated and reversal events are marked as not addressed, leaving permanence risk unquantified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 48,041 | 0 | 48,041 | |
| 2022 | 180,443 | 0 | 180,443 | |
| 2023 | 195,347 | 0 | 195,347 | |
| Total | 423,831 | 0 | 423,831 |
Risk Indicators
VVB-confirmed investment test
Avoidance project but no buffer pool stated, reversal not ad
Not addressed in any document
Project-specific baseline, not jurisdictional
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →