Jiangxi Province Le'An County Forest Farm Carbon Sink Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test in the later verification record.
missing The project-specific baseline method and a 23% buffer pool help, but the record also shows contradictions on leakage, safeguards, and verified ER totals.
Transparency
verified The monitoring period, VVB name, methodology, and verified emission reduction figure are stated in the extracted record.
missing Total claimed ERs, usage monitoring method, and several key MRV details are not found in the available documents.
Claim Safety
verified Leakage is treated quantitatively in the later record, and the project is not CORSIA-eligible.
missing The project is rejected by the administrator, and the large discrepancy in verified ER totals across documents raises over-crediting risk.
Documentation
verified Nineteen documents were used, and the extraction confidence is medium rather than low.
missing The evidence set is incomplete on several core items, and the record includes unresolved contradictions between earlier and later documents.
Detailed Analysis
Integrity
The later verification record supports additionality through an investment test and says the VVB confirmed it, which is a meaningful positive. The project also has a 23% buffer pool and reports no reversal events, but the baseline is project-specific rather than clearly reassessed, and the file contains contradictions on additionality, leakage, and reversal treatment. Because the authoritative registry status is rejected by the administrator, integrity confidence is reduced further.
Transparency
The extracted record identifies the VVB, methodology, monitoring period, and a verified emissions reduction total, which helps transparency. But the claimed ER total is not found, usage monitoring is not stated, and several other MRV details are missing from the available documents. The medium extraction confidence is acceptable, but the documentation is still incomplete for a high transparency score.
Claim Safety
Claim safety is weakened by the rejected registry status and by the large mismatch in verified ER totals across documents, with the later record showing 616,168 versus an earlier 90,546. Leakage is treated as quantified in the later record, which is better than an unaddressed zero deduction, but the contradiction with an earlier 0.7% leakage figure still creates uncertainty. The project is not CORSIA-eligible, which lowers dual-market concern, but the overall over-crediting risk remains material.
Documentation
Nineteen documents were used and the extraction confidence is medium, so the record is not thin. Even so, several important fields are missing or not stated, including claimed ERs, usage monitoring, and baseline reassessment timing. The contradictions across documents also indicate that the documentation set is not fully coherent, which limits the score.
Overall
I privileged the later verification record dated 2017-02-28 for additionality, safeguards, leakage, reversal status, and verified ERs because it is more recent and appears to be the stronger verification source than the earlier documents. That said, the contradictions are significant: additionality flips from false to true, safeguards from absent to present, leakage from 0.7% to 0%, reversal treatment from not addressed to none reported, and verified ER totals from 90,546 to 616,168. The authoritative registry status is rejected by the administrator, so despite some positive project-level evidence, the overall reliability and claim safety remain only moderate.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality, a buffer pool, and no reported reversal events in the later record. However, the file contains material contradictions across documents, the registry status is rejected by the administrator, and key MRV fields are missing or not stated, which weakens confidence in the claimed credits.
Project Description
The Improved Forestry Management project, owned by Beijing Shengdahuitong Carbon Management Co., Ltd, involves the conversion of 7,746.7 hectares of logged forests into protected forests across various state-owned departments in China. This conversion started in 2006 and will continue to reduce greenhouse gas emissions by 2,877,745 metric tons of CO2e over 30 years.
Red Flags
- Registry status: REJECTED BY ADMINISTRATOR — project formally rejected (terminal)
- The authoritative registry status is rejected by the administrator, which is a major credibility concern.
- There are contradictions on additionality, safeguards, leakage treatment, reversal treatment, and verified ER totals across documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 90,545 | 82,346 | 8,199 | |
| 2010 | 54,843 | 48,432 | 6,411 | |
| 2011 | 54,843 | 25,102 | 29,741 | |
| 2012 | 54,843 | 54,843 | 0 | |
| 2013 | 54,843 | 54,843 | 0 | |
| 2014 | 54,843 | 54,843 | 0 | |
| 2015 | 54,843 | 42,865 | 11,978 | |
| 2016 | 54,843 | 49,338 | 5,505 | |
| Total | 474,446 | 412,612 | 61,834 |
Cosa migliorerebbe questo punteggio
- Provide a reconciled document trail explaining the contradictions in additionality, leakage, safeguards, reversal status, and verified ER totals.
- Publish complete MRV evidence, including claimed ERs, usage monitoring details, and a clear baseline reassessment history.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but contradicted
Buffer pool present, no reversals reported
Quantified but contradicted
Project baseline, reassessment unclear
Mentioned but weakly documented
Not CORSIA-eligible and no CCP approval
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →