The Loblolly Project is a subsurface biomass carbon removal and storage project under the Isometric standard with a 1,000-year permanence claim, yet the verification report requires longer polymer durability testing beyond the current 6-month assay and no buffer pool is documented. A significant discrepancy in the verified ERR figure (3,921.79 in an earlier verification report versus 1,454.13 in the later one) raises material over-crediting concerns, and eight material findings—including electricity consumption mismatches and misaligned carbon-content testing dates—indicate data-quality issues that were only partially resolved through corrective actions.

Red Flags

  • Verified ERR dropped from 3,921.79 (Feb 2026 verification report) to 1,454.13 (Mar 2026 verification report), a 63% reduction that signals a material correction or over-claiming in the earlier figure
  • 1,000-year permanence claim is supported by only 6-month polymer durability testing; the VVB explicitly requires longer assays as a corrective action
  • No buffer pool percentage is stated in any available document despite the 1,000-year permanence claim and a medium (7%) reversal risk score
  • Eight material findings in the verification report, including electricity consumption discrepancies of up to ~500 kWh and removal dates that do not align with carbon-content testing records
  • Methodology is at V1.0 (first version), meaning the approach has not yet been stress-tested through multiple verification cycles

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

1,000-yr claim, 6-mo testing, no buffer pool

Leakage

0% deemed negligible, no quantified assessment

Baseline

Project-specific, no reassessment date stated

Safeguards

Grievance & benefit sharing present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents