Project Cajueiro
Audit Analysis
Project Cajueiro is an enhanced weathering carbon removal project verified by 350Solutions under the EWAG Protocol V1.1. The first reporting period produced six material findings related to incomplete baseline and feedstock measurements, and no additionality test was identified in the available documents. While the mineralization pathway inherently limits reversal risk, the absence of a buffer pool, a project-specific baseline, and a verified ERR figure leave meaningful uncertainty about the robustness of the credit claims.
Red Flags
- Six material findings in the verification report, including absence of baseline SOC, sulphur, and SIC measurements, and a control plot below the 2.5% area requirement
- No additionality test type or VVB confirmation of additionality found in any available document
- No verified ERR figure available to cross-check against the 46.94 tCO₂e claimed for the monitoring period
- No buffer pool percentage stated despite the project being a carbon removal credit
- FPIC was not conducted, and no lifetime ex-ante ERR estimate is available for pro-rata comparison
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test found in available documents
Mineralization limits reversal, but no buffer pool stated
0% deduction, justified only as 'deemed negligible'
Project-specific baseline, no reassessment date recorded
Grievance mechanism present, but FPIC not conducted
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →