Miombo Renewal
Audit Analysis
Miombo Renewal is a reforestation carbon-removal project under the Isometric standard with a jurisdictional baseline and a combined additionality test, but the evidence base is extremely thin: only a PDD and a stakeholder consultation document are available, with no VVB verification report, no ERR figures, no buffer-pool documentation, and no monitoring data. The 100-year permanence claim is unsupported by any documented reversal-risk mitigation, and FPIC was explicitly not conducted. The project cannot currently be assessed for over- or under-crediting because no claimed or verified removal figures exist in the record.
Red Flags
- 100-year permanence claim with no documented buffer pool or reversal-risk mitigation for a reforestation project
- No VVB verification of additionality or baseline found in the available documents
- No ERR figures (claimed or verified) available to assess over- or under-crediting
- FPIC explicitly not conducted despite stakeholder consultation being present
- Only two documents in the evidence base (PDD and stakeholder consultation); no verification report, monitoring report, or LCA
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test stated but no VVB verification found
100-year claim, no buffer pool documented
Described as quantified but no percentage available
Jurisdictional method, reassessment timing not stated
Grievance and benefit-sharing present, FPIC not conducted
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →