Skip to main content
ScoredCDMHydroChinaRegistry: RegisteredAMS-I.D

Nanshankou Cascade I 12 MW Hydropower Project in Geermu City of Qinghai Province,People’s Republic of China

Developer: Geermu Nanshankou Hydropower Development Co. Ltd

CDM-2409 ↗

#369of 4033 in Renewable energy#136of 2297 in China#309of 4472 in CDM (UNFCCC)#143of 1564 in AMS-I.D

Assessment

CarbonMeld document-based assessment

01020304 Overall 6.6 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

A 12 MW CDM hydropower project in Qinghai, China, with a solid investment-test additionality confirmed by DNV and a reasonable zero-leakage justification for grid-displacement. The project delivered approximately 98% of its pro-rata ex-ante expectation for the monitored period, indicating credible crediting. Key gaps include the absence of a verified ERR figure, sparse monitoring-method detail, and a minor baseline-methodology labeling inconsistency between the validation and monitoring reports.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2010
34,568034,568
2012
53,218053,218
2013
68,322068,322
Total156,1080156,108

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceAMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →