Vai al contenuto principale
GS avoidance Brazil Vintage 2013 Documentazione completa General Methodology v2.0

Rondinha Small Hydroelectric Power Plant

CNN-edc0d2 ↗

6.0 / 10
Integrity
6.2
Transparency
5.6
Claim Safety
6.0
Documentation
6.4

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.

missing Leakage is not addressed and baseline reassessment timing is not stated in the extracted record.

Transparency

verified A defined monitoring/crediting period is provided (2015–2021) and a named VVB (RINA Services S.p.A.) is identified.

missing The extracted record lacks the verified ER total and key calculation inputs (e.g., grid emission factor), limiting MRV transparency.

Claim Safety

verified The project is stated as not CORSIA-eligible, reducing certain downstream aviation-claim risks.

missing Over-crediting risk is harder to rule out because verified ERs are not found and leakage treatment is missing.

Documentation

verified Multiple core document types are available (PDD, validation report, monitoring report, financial) with medium extraction confidence.

missing Safeguards information is inconsistent across documents and several key fields are not found in the extracted record.

Detailed Analysis

Integrity

The validation/verification documentation indicates additionality was assessed via an investment test and confirmed by the VVB (validation report). The baseline is project-specific under ACM0002 (monitoring report), but the timing of any baseline reassessment is not stated in the extracted record. Leakage is flagged as not addressed (monitoring report) and no leakage deduction is provided, which weakens integrity assurance even for a renewable electricity project. No material findings or corrective actions are reported (monitoring report), which is a positive signal but does not substitute for missing quantified checks.

Transparency

The monitoring report provides a clear monitoring period (2015-01-01 to 2021-12-31) and identifies the VVB as RINA Services S.p.A. (monitoring report). However, the extracted record includes claimed ERs (89,634 tCO2e) but does not include the verified ER total, making it difficult to confirm what was actually issued/verified (monitoring report). Key calculation inputs such as the grid emission factor value are also not found in the extracted record, despite a grid EF year being referenced (monitoring report).

Claim Safety

The project is explicitly stated as not CORSIA-eligible (monitoring report), which lowers the risk of aviation-related double-claim pathways. Still, claim safety is constrained by the absence of verified ER totals in the extracted record and by missing leakage treatment, both of which increase over-crediting uncertainty (monitoring report). CCP status is not found in the extracted record, so buyers cannot rely on CCP screening as an external quality filter here.

Documentation

The evidence set includes a PDD, validation report, monitoring report, and financial documentation, with seven documents used and medium extraction confidence (extracted record). Several important fields are not found in the extracted record (e.g., verified ERs, grid emission factor value, leakage deduction), indicating incomplete extractable detail for independent review. Social safeguards elements appear weakly documented: FPIC and a grievance mechanism are reported as absent (extracted record), and safeguards coverage is inconsistent across documents.

Overall

Overall quality is moderate: additionality is VVB-confirmed and no material findings/corrective actions are reported (monitoring report/validation record), but MRV completeness is limited by missing verified ER totals and missing key quantification inputs. The safeguards contradiction must be treated as a reliability issue: the PDD indicates safeguards are mentioned, while the monitoring report indicates they are not. I privilege the more recent PDD date (2022-11-03) for whether safeguards are mentioned, but I still score down because the monitoring report (2022-09-15) suggests safeguards were not carried through into monitoring disclosure, creating uncertainty about implementation and reporting consistency.

Audit Analysis

This is a grid-connected small hydro project using a well-established CDM methodology, with additionality confirmed by the VVB and no reported material findings. However, key quantification elements (notably leakage treatment and verified ERs) are missing from the extracted record, and safeguards documentation is inconsistent across documents, which increases uncertainty and weakens claim confidence.

Project Description

The Small Hydroelectric Power Plant (PCH) Rondinha, located on the banks of the Chapecó River in the Uruguay River Basin, in Passos Maia, Santa Catarina, Brazil, is an example of clean and renewable electricity generation. With an installed capacity of 9.6 MW and a physical guarantee of 5.48 MW granted by ANEEL, PCH Rondin…

Red Flags

  • Verified emission reductions are not found in the extracted record, while claimed ERs are reported (89,634 tCO2e).
  • Leakage is not addressed and no leakage deduction is stated, despite being a required integrity check under methodology application.
  • Safeguards coverage is contradictory between the monitoring report and the PDD, and FPIC/grievance mechanism are reported as absent.

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2013 (non verificato).

Cosa migliorerebbe questo punteggio

  • Disclose the verified ER total for 2015–2021 and provide a clear reconciliation between claimed and verified ERs in the verification/monitoring package.
  • Provide explicit leakage assessment and (if applicable) a quantified leakage deduction consistent with ACM0002 application, plus the underlying justification.
  • Clarify safeguards implementation with documented FPIC (where relevant), a functioning grievance mechanism, and consistent safeguards reporting across the PDD and monitoring/verification documents.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversals reported

Leakage

Leakage not addressed; no deduction stated

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC/grievance absent; safeguards inconsistent

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti