SHATT AL-BASRA Combined Cycle Power Plant
#201of 202 in Industrial#28of 32 in Intl. Carbon Registry (ICR)
Audit Analysis
The Shatt Al-Basrah Combined Cycle Power Plant (ICR-391, Iraq) presents a near-total evidence gap: no additionality test, baseline method, leakage treatment, buffer pool, or monitoring data could be extracted from the available documents. With low extraction confidence, an unknown document type, and no identifiable verification body, the project's environmental integrity and claim safety cannot be assessed at any meaningful level.
Red Flags
- No additionality assessment, baseline methodology, or leakage treatment found in any available document — the core integrity pillars are entirely unverified
- Extraction confidence is low and the document type is listed as 'unknown', meaning the two source documents could not be reliably read or classified
- No verification body (VVB) is identified, leaving no independent assurance of the project's claims
- No monitoring period, crediting period, or ERR figures (claimed or verified) are available, making over- or under-crediting risk completely unassessable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 2,997,552 | 0 | 2,997,552 | |
| 2023 | 3,451,440 | 0 | 3,451,440 | |
| 2024 | 3,451,440 | 0 | 3,451,440 | |
| 2025 | 3,451,440 | 0 | 3,451,440 | |
| 2026 | 3,451,440 | 0 | 3,451,440 | |
| 2027 | 3,451,440 | 0 | 3,451,440 | |
| 2028 | 3,451,440 | 0 | 3,451,440 | |
| 2029 | 3,451,440 | 0 | 3,451,440 | |
| 2030 | 3,451,440 | 0 | 3,451,440 | |
| 2031 | 3,451,440 | 0 | 3,451,440 | |
| 2032 | 453,888 | 0 | 453,888 | |
| Total | 34,514,400 | 0 | 34,514,400 |
Risk Indicators
No additionality assessment found
No buffer pool or reversal data
No leakage treatment documented
No baseline method or reassessment found
No safeguards, FPIC, or grievance mechanism found
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →