Tadi 16 MW Hydropower Project In Zhejiang Province
Score Breakdown
Integrity
verified The monitoring report shows additionality confirmed by the VVB using an investment test and reports no material findings or corrective actions.
missing Leakage is not addressed and no leakage deduction is stated in the monitoring report, and baseline reassessment timing is not found in the extracted record.
Transparency
verified Claimed and verified emission reductions match (97,521 tCO2e) for the stated monitoring period in the monitoring report.
missing Key MRV/context fields are missing in the extracted record (for example, the grid EF vintage year and any baseline reassessment date).
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing certain downstream double-claiming/eligibility risks.
missing Over-crediting risk is harder to rule out because leakage is not addressed and the baseline is project-specific with no reassessment timing found.
Documentation
verified Multiple core documents are present (PDD, validation report, monitoring report) and extraction confidence is high.
missing Document set contains material inconsistencies (FPIC/safeguards and crediting period), which undermines document reliability.
Detailed Analysis
Integrity
The monitoring report (2010-08-03) indicates additionality was confirmed by the VVB using an investment test and reports no material findings and no corrective actions. Baseline setting is project-specific (ACM0002 v07), and the grid emission factor is reported as 0.9046, but the grid EF vintage year and any baseline reassessment date are not found in the extracted record. Leakage is explicitly not addressed in the monitoring report and no leakage deduction is stated, which weakens accounting robustness.
Transparency
For the monitoring period 2008-01-01 to 2009-11-22, the monitoring report (2010-08-03) reports 97,521 tCO2e claimed and 97,521 tCO2e verified, suggesting a consistent verification outcome. The VVB is identified as Bureau Veritas Certification Holding SAS, supporting audit traceability. However, several contextual MRV details are missing in the extracted record (for example, the grid EF year and leakage quantification), limiting reproducibility from the extracted data alone.
Claim Safety
The project is marked as not CORSIA-eligible, which reduces the risk of certain aviation-related claims. Still, the baseline is project-specific and the extracted record does not show when it was last reassessed, increasing uncertainty around baseline conservativeness over time. In addition, leakage is not addressed in the monitoring report, which increases residual over-crediting/claim risk because a potential deduction is neither justified nor quantified.
Documentation
The extracted record includes a monitoring report, validation report, and PDD, with high extraction confidence and a relatively large number of documents used (8). The monitoring report (2010-08-03) shows no corrective actions required, which supports completeness for that period. Nevertheless, contradictions across documents on safeguards/FPIC and the crediting period indicate documentation inconsistency that reduces confidence in the overall record.
Overall
Overall scoring is pulled down mainly by evidence gaps on leakage and baseline reassessment, plus cross-document inconsistencies. On safeguards, the validation report (2009-06-26) indicates safeguards were mentioned, while the monitoring report (2010-08-03) indicates they were not; the more recent monitoring report is privileged for the score because it reflects what was actually reported during monitored implementation, but the contradiction reduces confidence. On FPIC, the PDD (2009-06-15) indicates FPIC was conducted while the monitoring report (2010-08-03) indicates it was not; again the monitoring report is privileged as the later implementation-period document, and the inconsistency is treated as a reliability red flag. On the crediting period, two validation reports conflict (2009-06-26 shows 2009-10-01—2016-09-30; 2010-09-27 shows 2008-01-01—2009-11-22); the period matching the monitoring report (2008-01-01—2009-11-22) is privileged because it aligns with verified issuance for the monitored interval, but the contradiction materially weakens documentation reliability.
Audit Analysis
This VCS hydropower project has VVB-confirmed additionality and a clean verification outcome for the monitored period, with claimed and verified reductions matching. However, key integrity elements are weakly evidenced in the extracted record, especially leakage treatment and baseline reassessment timing, and there are notable cross-document inconsistencies on safeguards/FPIC and the crediting period.
Project Description
The Tadi 16 MW Hydropower Project generates clean electricity by utilizing the water resources of the Qujiang River in Zhejiang Province. Developed by Quzhou Tadi Hydro Complex Development Co., Ltd, the project delivers electricity to the East China Power Grid without CO2 emissions. Additionally, it enhances the capability of shipping, water supply, and irrigation for the local area.
Red Flags
- Leakage is not addressed in the monitoring report and no leakage deduction is stated, creating an evidence gap for a core accounting element.
- Contradictions across documents on FPIC/safeguards and on the crediting period reduce confidence in the reliability of the project narrative and boundaries.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 49,395 | 49,365 | 30 | |
| 2009 | 48,126 | 0 | 48,126 | |
| Total | 97,521 | 49,365 | 48,156 |
Cosa migliorerebbe questo punteggio
- Provide explicit leakage assessment and, if applicable, a quantified leakage deduction with justification in monitoring/verification documentation.
- Resolve and document consistent statements on FPIC/safeguards and clarify the definitive crediting period with registry-aligned evidence (e.g., VCS registration/issuance records).
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversal events reported
Leakage not addressed; deduction not stated
Project-specific baseline; reassessment timing unclear
FPIC/grievance not evidenced; safeguards inconsistent
Not CORSIA-eligible; CCP status not found
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →