Wind power project by HZL in Karnataka.
Developer: Hindustan Zinc Limited
Methodology: ACM0002 (CDM)
Assessment
No CarbonMeld analysis
This project was archived before CarbonMeld analysed it: no score was ever published, and none will be, because archived projects are no longer analysed. The registry data and credit vintages below come from the last registry snapshot.
Standard and methodology
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Oct 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Registry labels last checked:2026-11-01
Credit VintagesExhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 46,386 | 46,386 | 0 | |
| 2013 | 3,741 | 3,741 | 0 | |
| 2014 | 51,605 | 51,605 | 0 | |
| 2015 | 45,570 | 45,570 | 0 | |
| 2016 | 48,655 | 48,655 | 0 | |
| Total | 195,957 | 195,957 | 0 |
Retired by
- DPDgroup97,175 t
- Stadtwerke Aurich GmbH, Wallstraße 54, 26603 Aurich1,212 t
- Stadtwerke Geseke GmbH, Mühlenstr. 11, 59590 Geseke93 t
- Vereinigte Gas- und Wasserversorgung GmbH, Ringstraße 144, 33378 Rheda-Wiedenbrück32 t
Organisations named as beneficiaries in the registry's public retirement records.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Yamanli III Hydoeletric Power PlantVCS-1014
- Renewable Wind Power Project by Hero Future EnergiesVCS-1946
- Solar and Wind Power Project by NTPC LimitedVCS-1772
- My Son - Hoan Loc Viet Solar Energy ProjectVCS-1958
- Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP)VCS-2094
- OAxaca IV Wind Energy ProjectVCS-1041
- AES Saurashtra WindfarmsVCS-1039
- Redstone CSP projectVCS-5146
