12.25 MW Bundled Wind Power Project in India
#4of 1935 in Renewable energy#4of 975 in India#4of 1459 in CDM (UNFCCC)#4of 806 in AMS-I.D
Audit Analysis
A straightforward 12.25 MW wind power project in India under CDM with a well-documented investment additionality test verified by TÜV NORD CERT, a jurisdictional grid-emission-factor baseline, and a reasonable zero-leakage claim. The main gaps are the absence of verified ERR figures in the extracted record, thin safeguards documentation (no FPIC or grievance mechanism), and unstated CORSIA/CCP status. No outstanding corrective actions or material findings were reported.
Red Flags
- Verified ERR for the 2012–2015 monitoring period is not present in the extracted record, preventing a direct over/under-delivery check against the 69,072 tCO2e lifetime claim
- Safeguards documentation is thin: no FPIC record and no grievance mechanism are found in the available documents, despite safeguards being mentioned in the PDD
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Wind – no reversal risk
0 % deemed negligible, justified
Jurisdictional grid EF (2008)
Mentioned but FPIC / grievance absent
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →