CDM-9102 ↗

This rating is archived — the project is no longer listed or its registry data has changed. This is the last published analysis (2026-08-24).
4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM coal-to-gas CHP switch project with VVB-confirmed additionality and a standardised methodology (AM0107), but undermined by a 19% grid emission factor discrepancy between the PDD and validation report, ten corrective actions raised at validation, and a near-total absence of monitoring-period data. The project-specific baseline and lack of verified emission reduction figures limit confidence in the claimed 115,404 tCO₂e lifetime reduction.

Red Flags

  • Grid emission factor differs by ~19% between the PDD (0.6286, Nov 2012) and the validation report (0.74945, Dec 2012), directly affecting the credit calculation
  • Ten corrective actions were required at validation, including misaligned project emissions calculations between the PDD and the ER sheet, incorrect VAT rates, and unverified project start-date evidence
  • No monitoring-period data, verified ERR, or FNRB methodology is present in the extracted record, making it impossible to confirm actual delivery against the 115,404 tCO₂e claim

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Quantified but no specific % stated

Baseline

Project-specific, no reassessment data

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AM0107

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents