Skip to main content
CDMEE supply sideChinaAM0107

Beijing Caoqiao Natural Gas CCGT Project

CDM-8764 ↗

#447of 617 in Industrial#926of 1181 in China#1110of 1514 in CDM (UNFCCC)#4of 7 in AM0107

4.5/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A CDM energy-efficiency project (natural gas CCGT replacing coal-fired generation) with VVB-confirmed additionality and a reasonable zero-leakage claim, but significant gaps in monitoring data, no verified ERR figures, and a project-specific baseline limit confidence. The low extraction confidence and absence of any monitoring reports make it difficult to confirm actual delivery against the 375,190 tCO2e lifetime claim.

Red Flags

  • No monitoring reports or verified ERR figures found in the extracted record — actual delivery against the 375,190 tCO2e claim cannot be confirmed
  • Low extraction confidence across the document set, with one document of unknown type, reducing reliability of the evidence base
  • Project-specific baseline with no reassessment date recorded; the 2013 grid emission factor (0.6286) has not been updated for the full crediting period
  • Material findings in the validation report included a wrongly computed IRR and inconsistent NCV/EF values in the PDD, indicating initial quality-control weaknesses (corrected via CARs)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

EE project, no reversal risk

Leakage

0% quantified, physically reasonable

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AM0107

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents