Hangzhou Huadian Banshan NG Combined Cycle Cogeneration Project
#505of 617 in Industrial#1032of 1181 in China#1267of 1514 in CDM (UNFCCC)#7of 7 in AM0107
Audit Analysis
A CDM-era natural gas combined-cycle cogeneration project with VVB-confirmed additionality but significant data gaps: no monitoring reports, no verified emissions reductions, and two material contradictions in the grid emission factor and baseline method. The low extraction confidence and absence of post-validation data make it difficult to confirm that claimed credits were actually delivered.
Red Flags
- Grid emission factor discrepancy: validation report uses 0.6286 tCO2/MWh while an appendix cites 0.7494 tCO2/MWh — the lower value inflates claimed credits by roughly 16%
- Baseline method contradiction: validation report states a project-specific baseline while an appendix references a jurisdictional baseline, creating ambiguity about which baseline was actually applied
- No monitoring reports or verified ERR figures found in the extracted record, so the 411,533 tCO2e lifetime claim is entirely unverified
- Five material findings at validation (including a VAT calculation error and a non-compliant heat-to-electricity ratio) required corrective actions before registration
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
No buffer pool; EE project, low reversal risk but unquantifi
0% deduction, described as quantified but no calculation vis
Project-specific baseline; contradiction with appendix
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →