Skip to main content
CDMEE supply sideChinaAM0107

China National Offshore Oil Corporation (CNOOC) Gas & Power Group Zhuhai Gaolan Port Economic Zone Natural Gas Cogeneration Project

CDM-8888 ↗

#197of 617 in Industrial#514of 1181 in China#588of 1514 in CDM (UNFCCC)#2of 7 in AM0107

5.2/ 10
Integrity
6.0
Transparency
4.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A CDM natural gas cogeneration project validated by Bureau Veritas in 2012 with a combined additionality test and a thorough validation process (8 corrective actions, 12 clarifications all resolved). However, the available record contains no monitoring or verification reports, leaving the actual emission reductions unverified against the 493,359 tCO2e lifetime claim. The project-specific baseline and absence of FNRB or usage-rate data limit confidence in the credit quantity.

Red Flags

  • No monitoring or verification reports are present in the extracted record; the 493,359 tCO2e lifetime claim cannot be cross-checked against actual performance
  • Project-specific baseline (not jurisdictional) with no stated reassessment date, limiting confidence in baseline robustness over the full 10-year crediting period
  • FNRB value and usage monitoring method are not stated in any available document, leaving the energy-saving calculation chain partially unverifiable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No reversal data; no monitoring reports

Leakage

Quantified at 0% with justification

Baseline

Project-specific; no reassessment date stated

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not detai

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AM0107

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents