Skip to main content
CDMEE supply sideChinaAM0107

Beijing Northwest Thermal Power Center Jingneng Gas-fired cogeneration Project

CDM-9678 ↗

#449of 617 in Industrial#928of 1181 in China#1112of 1514 in CDM (UNFCCC)#6of 7 in AM0107

4.5/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A CDM gas-fired cogeneration project with VVB-confirmed additionality and no inherent reversal risk, but significant evidence gaps: no monitoring data, no verified ERR, and a 0% leakage deduction justified only as 'quantified.' The low extraction confidence and absence of monitoring reports limit confidence in the project's actual performance.

Red Flags

  • No monitoring period or verified ERR data found in any available document — actual performance cannot be assessed against the 611,463 tCO2 claimed over the 7-year crediting period
  • Leakage deduction of 0% is justified as 'quantified' but no quantification detail is present in the extracted record, making the justification unverifiable
  • Project emissions were corrected upward by approximately 4% (from 2,316,355 to 2,412,269 tCO2) due to an NCV/EF inconsistency identified during validation, indicating initial calculation errors
  • Low extraction confidence across the document set, with one of four evidence documents listed as 'unknown'

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

EE supply-side, no reversal risk

Leakage

0% deduction, justification unverifiable

Baseline

Project-specific, no reassessment data

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CCP/CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AM0107

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents