Beijing Northeast Power Center Jingneng Gasfired Cogeneration Project
#448of 617 in Industrial#927of 1181 in China#1111of 1514 in CDM (UNFCCC)#5of 7 in AM0107
Audit Analysis
A CDM gas-fired cogeneration project validated by Bureau Veritas with a confirmed combined additionality test, but the available record is thin: no monitoring reports, no verified emission reductions, no buffer pool, and five material findings (all corrected) during validation. The ERR figures in the PDD and validation report differ by a factor of seven, which is consistent with an annual-versus-lifetime presentation but was not clearly labelled, reducing confidence in the data trail.
Red Flags
- Five material findings in the validation report, including an IRR calculation error and missing monitoring parameters, indicate the initial submission was materially incomplete
- No buffer pool or permanence mechanism is documented for a project whose operational life could end before the crediting period expires
- No monitoring reports or verified emission-reduction figures are present in the extracted record, so actual performance cannot be assessed
- Leakage deduction is 0% with only a 'quantified' justification label; the underlying quantification is not available in the extracted documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by VVB
No buffer pool documented
0% deduction, justification not verifiable
Project-specific, no reassessment date
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →