Skip to main content
CDMEE supply sideChinaAM0107

Beijing Northeast Power Center Jingneng Gasfired Cogeneration Project

CDM-8763 ↗

#448of 617 in Industrial#927of 1181 in China#1111of 1514 in CDM (UNFCCC)#5of 7 in AM0107

4.5/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A CDM gas-fired cogeneration project validated by Bureau Veritas with a confirmed combined additionality test, but the available record is thin: no monitoring reports, no verified emission reductions, no buffer pool, and five material findings (all corrected) during validation. The ERR figures in the PDD and validation report differ by a factor of seven, which is consistent with an annual-versus-lifetime presentation but was not clearly labelled, reducing confidence in the data trail.

Red Flags

  • Five material findings in the validation report, including an IRR calculation error and missing monitoring parameters, indicate the initial submission was materially incomplete
  • No buffer pool or permanence mechanism is documented for a project whose operational life could end before the crediting period expires
  • No monitoring reports or verified emission-reduction figures are present in the extracted record, so actual performance cannot be assessed
  • Leakage deduction is 0% with only a 'quantified' justification label; the underlying quantification is not available in the extracted documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

No buffer pool documented

Leakage

0% deduction, justification not verifiable

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AM107

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents