Skip to main content
CDMHydroIndiaAMS-I.D

2 X 3.5 MW Ullunkal Hydro Power Project in Kerala, India.

CDM-2937 ↗

#408of 1935 in Renewable energy#206of 975 in India#258of 1459 in CDM (UNFCCC)#145of 806 in AMS-I.D

5.9/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

A CDM-registered small hydro project in Kerala, India, with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. The project delivered roughly 103% of its pro-rata expectation in the first monitoring period, indicating no over-crediting signal. However, six material findings (including an unsubstantiated investment barrier analysis), the absence of documented FPIC or a grievance mechanism, and several unreported MRV parameters (verified ERR, FNRB, usage monitoring) limit confidence in the overall quality.

Red Flags

  • Four CARs and two CLs were raised during validation, including that the investment barrier analysis and financial indicators were not substantiated (CAR #4) and that the project start date and prior CDM consideration were not transparent (CAR #3).
  • The grid emission factor of 0.85 tCO2/MWh is drawn from 2007 data, which is dated relative to the 2010–2020 crediting period.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2013
35,866035,866
Total35,866035,866

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, reasonable for hydro

Baseline

Jurisdictional but grid EF from 2007; reassessment not state

Safeguards

Safeguards mentioned; no FPIC or grievance mechanism documen

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents