40 MW Grid Connected Wind Power Project
#134of 770 in Renewable energy#79of 387 in India#23of 213 in CDM (UNFCCC)#94of 383 in ACM0002
Audit Analysis
A standard 40 MW grid-connected wind project in India registered under CDM with a combined additionality test confirmed by TÜV NORD CERT. The project delivered only about 25% of the pro-rata emission reduction expectation for the monitored period, raising over-crediting concerns, and several baseline and additionality details show inconsistencies across documents. Fundamentally sound as a wind avoidance project, but the delivery gap and documentation contradictions temper confidence.
Red Flags
- Verified emissions reductions of 30,729 tCO₂e represent only ~25% of the pro-rata expectation (~122,000 tCO₂e) for the 4.5-year monitoring period out of the 10-year crediting period, suggesting the ex-ante estimate was significantly optimistic
- Baseline method is described as 'project' in the 2022 monitoring report but 'jurisdictional' in the 2008 validation report — a material inconsistency for a grid-connected wind project where the grid emission factor should be the baseline
- Grid emission factor of 0.89 tCO₂/MWh is dated 2007 and no updated or reassessed value is found in the extracted record
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 60,613 | 0 | 60,613 | |
| 2013 | 212,611 | 0 | 212,611 | |
| 2015 | 66,543 | 0 | 66,543 | |
| 2022 | 274,490 | 0 | 274,490 | |
| Total | 614,257 | 0 | 614,257 |
Risk Indicators
Combined test VVB-confirmed
Avoidance project, no reversals
0% justified for grid feed-in
Method contradiction, 2007 EF
Grievance & benefits noted, FPIC absent
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →