5.1 MW bundled Wind Power Project in Tirunelveli (Tamil Nadu)
#25of 1935 in Renewable energy#17of 975 in India#17of 1459 in CDM (UNFCCC)#10of 806 in AMS-I.D
Audit Analysis
A 5.1 MW CDM wind project in Tamil Nadu with a solid jurisdictional baseline, VVB-confirmed investment additionality, and no reversal risk typical of avoidance-type wind credits. The first monitoring period delivered approximately 102% of the pro-rata expectation, indicating no over-crediting. Several monitoring and eligibility details (FNRB, CORSIA, CCP) are not stated in the available documents, and minor contradictions between the PDD and monitoring report reduce confidence slightly.
Red Flags
- The validation report states a lifetime ERR of 117,000 tCO2 while the monitoring report reports 11,969 tCO2 for the first year — these are on different bases (10-year vs 1-year) but the discrepancy in the extracted record could mislead a reader who does not reconcile them.
- Leakage justification is inconsistent: the monitoring report states 'deemed negligible' while an appendix describes it as 'quantified' — the reconciliation is unclear.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
- Only one year of monitoring data (2009–2010) is available out of a 10-year crediting period, limiting the ability to assess long-term performance.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, negligible for wind
Jurisdictional grid EF (2007)
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →