5 MW Sahu Hydro Electric Project for a grid connected system in Himachal Pradesh, India
#91of 387 in India#29of 213 in CDM (UNFCCC)#47of 417 in AMS-I.D
Audit Analysis
A 5 MW grid-connected small hydro project in Himachal Pradesh, India, verified under CDM methodology AMS-I.D. with a combined additionality test confirmed by TÜV Rheinland Japan. The project is fundamentally sound for its type, but documentation gaps (missing verified ERR, weak leakage justification, unresolved PDD/monitoring plan revisions) and three inter-document contradictions moderate confidence in the credit claims.
Red Flags
- Corrective actions remain open: PDD revision to reflect actual turbine type, voltage, and power factor, and Monitoring Plan revision to match actual procedures and equipment.
- Leakage deduction of 0% is justified as 'not addressed' in the 2024 monitoring report, contradicting the 2011 report which stated it was quantified — the justification basis is unclear.
- Baseline method is recorded as 'project' in the 2024 monitoring report but 'jurisdictional' in the 2009 validation report, creating ambiguity about the baseline construction.
- Verified ERR figure is not present in the extracted record, preventing independent cross-check of claimed credits against actual monitoring data.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 34,279 | 0 | 34,279 | |
| Total | 34,279 | 0 | 34,279 |
Risk Indicators
VVB-confirmed combined test
Hydro generation, no reversal risk
0% deduction, justification not addressed
Grid EF 2007, method label contradiction
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →