50MW Greenfield Solar Plant in UP by Jakson Group
#63of 770 in Renewable energy#35of 387 in India#79of 629 in Verra (VCS)#43of 383 in ACM0002
Audit Analysis
A 50 MW greenfield solar project in Uttar Pradesh with a VVB-confirmed investment additionality test and a jurisdictional baseline, verified by Applus+ Certification. The project is a straightforward avoidance-type renewable energy credit with no inherent reversal risk, but the 0% leakage deduction lacks a robust justification and three corrective action requests were raised during verification. Multiple inter-document contradictions (largely attributable to different reporting periods) reduce confidence in data consistency.
Red Flags
- Leakage deduction of 0% is justified only as 'deemed negligible' (monitoring report) or 'not addressed' (verification report) — no quantitative analysis or explicit methodology reference supports the zero deduction.
- Three corrective action requests (CARs) were issued during verification, including a calculation error in crediting period duration and a deviation in PV module configuration from the PDD.
- FPIC status is contradictory: the 2024 verification report confirms FPIC was conducted, while the 2024 monitoring report states it was not — a material safeguard discrepancy.
- Grid emission factor of 0.9368 tCO2/MWh is from 2018; no evidence of an updated or more recent jurisdictional factor was found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 28,581 | 0 | 28,581 | |
| 2022 | 21,605 | 0 | 21,605 | |
| Total | 50,186 | 0 | 50,186 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, weak justification
Jurisdictional grid factor (2018)
FPIC contradiction, grievance present
CORSIA excluded, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.