7.2 MW Wind Project at Chitradurga, Karnataka
#290of 1935 in Renewable energy#145of 975 in India#178of 1459 in CDM (UNFCCC)
Audit Analysis
A 7.2 MW CDM wind project in Karnataka with a VVB-confirmed barrier additionality test and jurisdictional baseline, but a 27% shortfall in verified reductions versus the pro-rata expectation for the monitoring period, 15 corrective action requests (all closed), and a pending PDD revision for a transmission-loss formula error. Several key MRV parameters (FNRB, usage monitoring method, CORSIA/CCP status) are absent from the extracted record, limiting confidence in the full data chain.
Red Flags
- Verified reductions of 3,484 tCO2e are 27.08% below the pro-rata expectation of 4,778 tCO2e for the Sep–Dec 2012 monitoring period, as flagged in the verification report material findings.
- A corrective action remains open: the PDD must be revised to correct a typographical error in the transmission-loss formula identified during the first periodic verification.
- 15 Corrective Action Requests and 15 Clarification Requests were raised during verification, indicating notable data-quality friction, though all were closed.
- Grid emission factor of 0.86 tCO2/MWh is anchored to 2007 data; no updated or reassessed baseline figure is found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 33,452 | 0 | 33,452 | |
| 2012 | 12,208 | 0 | 12,208 | |
| 2013 | 16,818 | 0 | 16,818 | |
| Total | 62,478 | 0 | 62,478 |
Risk Indicators
VVB-confirmed barrier test
Wind avoidance; no reversal risk
Deemed negligible; 0% deduction
Jurisdictional but 2007 grid EF; no reassessment date found
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →