75 MW Neo Solar Power Project
GS-2596 ↗ · current registry ID: GS7751
#64of 770 in Renewable energy#36of 387 in India#22of 426 in Gold Standard (GS)#44of 383 in ACM0002
Audit Analysis
The 75 MW Neo Solar Power Project in India is a fundamentally sound solar thermal electricity project with VVB-confirmed additionality, a jurisdictional baseline, and negligible leakage risk appropriate to the technology. However, the verification process surfaced multiple material findings—including a calculation error in emission reductions and an omitted degradation factor—all of which were resolved before credit issuance. Several data points (FNRB, usage monitoring, CORSIA/CCP status) remain unstated, and the ERR figures differ between the validation and verification reports, though this is explained by the different reporting bases.
Red Flags
- Multiple material findings in the verification report, including a calculation error in total emission reductions and an omitted degradation factor in energy generation, indicate initial documentation quality issues (all resolved per the verification report of 2025-12-18).
- The validation report (2024-11-15) states a lifetime ERR of 516,979 tCO2e while the verification report (2025-12-18) reports 345,572 tCO2e for the monitoring period; although explainable by different bases, the discrepancy warrants scrutiny.
- Free, Prior and Informed Consent (FPIC) was not conducted, and no buffer pool or permanence mechanism is documented in the available records.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Solar thermal – no reversal risk
Negligible – appropriate for solar
Jurisdictional method
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →