80 MW SOLAR BY FERMI SOLAR FARMS PVT LTD - CHALISGAON.
#204of 1935 in Renewable energy#105of 975 in India#88of 1339 in Verra (VCS)#143of 1287 in ACM0002
Audit Analysis
An 80 MW solar PV project in India with VVB-confirmed additionality via an investment test and a straightforward renewable-energy credit structure. The project is generally sound but is held back by a project-specific (non-jurisdictional) baseline, inconsistent leakage justification across documents, a material finding on incorrect project coordinates, and seven corrective actions related to reporting inconsistencies. No reversal risk applies given the renewable-energy nature of the credits.
Red Flags
- Material finding: earlier reported project coordinates were incorrect and did not represent the actual location (2025 verification report)
- Seven corrective actions required, including inconsistent crediting-period dates, missing meter serial numbers, and a transmission-loss calculation not aligned with the PDD monitoring plan
- Leakage justification is contradictory: the 2022 verification report states leakage was 'not addressed' while the 2025 monitoring report calls it 'deemed negligible'—no quantified analysis is documented in either
- Baseline method is described as 'project' in the 2019 verification report but 'jurisdictional' in the 2025 monitoring report, creating ambiguity about the actual baseline approach
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 57,879 | 57,879 | 0 | |
| 2019 | 194,090 | 61,279 | 132,811 | |
| 2020 | 133,863 | 51,546 | 82,317 | |
| 2021 | 98,516 | 58,019 | 40,497 | |
| Total | 484,348 | 228,723 | 255,625 |
Risk Indicators
VVB-confirmed investment test
Renewable energy – no reversal risk
0% deduction, justification inconsistent across docs
Project-specific; method label contradicted in MR
FPIC & grievance confirmed 2025 but absent in 2022 record
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents