Skip to main content
CDMWindIndiaAMS-I.D

9.75 MW Bundled wind power project in Kerala, India

CDM-3509 ↗

#229of 770 in Renewable energy#154of 387 in India#54of 213 in CDM (UNFCCC)#74of 417 in AMS-I.D

5.5/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A 9.75 MW bundled wind project in Kerala under CDM AMS I.D. v18 with a 7-year crediting period. The project delivered approximately 62% of its pro-rata expected emissions reductions for the elapsed monitoring period, which is conservative. However, three material contradictions between the validation and monitoring reports (baseline method, leakage justification, and ERR figures), five corrective-action findings, and the absence of a confirmed VVB additionality verification limit confidence in the project's data integrity.

Red Flags

  • Three contradictions between the validation report (2020) and monitoring report (2022) on baseline method, leakage justification, and total ERR figures undermine data reliability
  • Five material findings requiring corrective action, including a missing baseline validity section (Section B.4) and an incorrect grid reference in the PDD
  • Additionality test type is recorded as 'combined' but VVB confirmation of the test is not stated in the extracted record
  • No buffer pool percentage is recorded, leaving permanence risk unquantified despite the absence of reported reversal events

Credit Vintages

IssuedRetiredAvailable
2012
19,160019,160
Total19,160019,160

Risk Indicators

Additionality

Combined test present, VVB confirmation not stated

Permanence

Wind (low reversal risk), no buffer pool recorded

Leakage

0% deduction, contradictory justification across documents

Baseline

Method contradictory (project vs jurisdictional), reassessed

Safeguards

Safeguards mentioned, FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents